An Extensive Project Portfolio
The amazing success stories we have overseen for our clients over the past three decades are milestones in our history – they tell the story of ACT Engineers. We have not only changed the literal landscape for the better for dozens of state, county, municipal, institutional, public and private clients; but we continue to change and innovate our approach to what we do best; by developing and applying the latest technology in our fields of expertise.

Atlantic City Municipal Utilities Authority Cradle Replacement Project ACT Engineers provided construction inspection services for temporary wetland disturbances resulting from the replacement of more than 600 concrete cradles supporting the two 48-inch diameter potable … CONTINUE »

Beach Creek Marina ACT Engineers is currently working on sediment sampling, dredging program and CAFRA permitting for a 200-foot high-rise residential development at the Beach Creek Marina, North Wildwood, New Jersey. … CONTINUE »

Berkeley Township, Ocean County, NJ Multiple Residential Developments ACT Engineers provided construction inspection services for temporary wetland disturbances resulting from the replacement of more than 600 concrete cradles supporting the two 48-inch diameter potable … CONTINUE »

Biles Island Master Plan Development Falls Township engaged ACT Engineers, to prepare a Master Plan for Biles Island. … CONTINUE »

Brick Township Flood Mitigation Concept Engineering ACT Engineers, Inc. conducted research and review of ongoing tidal and stormwater flooding in 13 back bay communities in Brick Township. ACT performed field surveying to collect additional topographic … CONTINUE »

Coastal and Waterfront Permitting ACT Engineers provides environmental consulting and permitting services for a wide range of ocean and waterfront properties throughout New Jersey. … CONTINUE »

Doubletree Inn Environmental Compliance ACT Engineers conducted Site Investigation activities at an active commercial property. ACT conducted a limited subsurface investigation to determine if subsurface soils and/or groundwater have been … CONTINUE »

Flood Mitigation and Drainage Master Plan ACT Engineers, Inc. is currently developing a Flood Mitigation & Drainage Master Plan that identifies near term and long-term strategies to increase flooding resiliency. This will be a collaborative e … CONTINUE »

New Jersey Turnpike Widening During the New Jersey Turnpike Authority’s 6 to 9 Widening Program, ACT Engineers coordinated meetings with public officials, stakeholders and the community prior to and during the Widening Program. … CONTINUE »

Newark Energy Center Generating Station This electrical generation project included the evaluation of all facility permits and optimization of site grading for construction. Site Grading included the balancing of all Wetland Delineation, F … CONTINUE »

Ocean City Dredging Program ACT Engineers has partnered with Anchor QEA to develop a dredging plan to maintain the waterway, lagoons and harbors in the bay area of Ocean City. … CONTINUE »

Ocean City Special Projects As general environmental consultant on retainer with the City of Ocean City, services provided included all aspects of Federal and State permitting for various special projects proposed by the City of … CONTINUE »

Ocean City, Cape May County, NJ Municipal Airport As Environmental Consultant to the City of Ocean City, State and Federal regulatory approvals were obtained for multiple improvements including, stormwater management upgrades … CONTINUE »

Ocean Reef Condominiums Bulkhead Construction ACT Engineers was retained by the Ocean Reef Condominium Association, a 188 unit residential development, located on the Great Egg Harbor … CONTINUE »

PSE&G Estuary Enhancement Program Environmental Permitting and Monitoring ACT Engineers and Delmarva Aquatic and Wetland Services, LLC key personnel, under former employment, provided environmental permitting and … CONTINUE »

PSE&G Utility Transmission Upgrade This electrical transmission upgrade project included the program management associated with permit procurement and construction readiness for along a 7.5 mile transmission line in Burlington and Camd … CONTINUE »

Railroad Ave Promenade The Railroad Avenue Promenade is located in the heart of Bordentown City, adjacent to the historic Conrail railroad right-of-way that was used for the first movement by steam engine over rails in … CONTINUE »

Route 52 Causeway Replacement Public Involvement began in 2002 with the two communities connected by a deteriorating causeway critical to both shore communities that depend on tourism and the ability to move large numbers of peopl … CONTINUE »

Royal Farms and Dollar General ACT Engineers partnered with the design engineers to conduct an environmental inventory of the sites in preparation of the required local … CONTINUE »

Shooting Island Shoreline Restoration The Shooting Island Shoreline Restoration project results in the protection and restoration of 100+ acres of tidal wetlands on this bay island. … CONTINUE »

Trenton 250 Master Plan ACT Engineers assisted in the development of the Trenton 250 Master Plan. As Trenton approaches its 250th Anniversary, the geographic and environmental advantages that made it an important colonial … CONTINUE »

Waterview Office Park ACT Engineers work included site planning, cost estimating, Civil engineering, surveying, landscape design modifications, and environmental permitting for a new four building complex encompassing 300, … CONTINUE »