Archives: Projects

Brick Township Flood Mitigation Concept Engineering ACT Engineers, Inc. conducted research and review of ongoing tidal and stormwater flooding in 13 back bay communities in Brick Township. ACT performed field surveying to collect additional topographic … CONTINUE »

Ocean City Comprehensive Back Bay Adaptive Management Plan Originally envisioned as a plan to anticipate and manage long range dredging needs, the scope of the plan was modified to address comprehensive back bay management; this includes the function and heal … CONTINUE »

Shooting Island Shoreline Restoration The Shooting Island Shoreline Restoration project results in the protection and restoration of 100+ acres of tidal wetlands on this bay island. … CONTINUE »

Brick Hydrographic Survey ACT Engineers conducted bathymetric surveying for the potential development of a Township-wide dredge permit and material reuse/handling program. … CONTINUE »

Trenton 250 Master Plan ACT Engineers assisted in the development of the Trenton 250 Master Plan. As Trenton approaches its 250th Anniversary, the geographic and environmental advantages that made it an important colonial … CONTINUE »

New Jersey Turnpike Widening During the New Jersey Turnpike Authority’s 6 to 9 Widening Program, ACT Engineers coordinated meetings with public officials, stakeholders and the community prior to and during the Widening Program. … CONTINUE »

Joint Base MDL Traffic Study Formal and informal vehicle parking areas had been developed or evolved to support staffing of office, laboratory, hangar, and warehouse buildings on the Lakehurst area of JB MDL. … CONTINUE »

Fort Dix Solar Array – Joint Base McGuire Dix Lakehurst ACT completed a Topographic, Utility and Wetlands Survey for the design and construction of a 16.5 MW ballast mount solar field on top of the closed landfill located on the Dix Area of JB MDL … CONTINUE »

Walt Whitman Bridge PA Approach ACT Engineers completed a Topographic and ROW Survey for the design of highway infrastructure improvements to the corridor including the ramps and bridges encompassing 270 Acres. … CONTINUE »

Waterview Office Park ACT Engineers work included site planning, cost estimating, Civil engineering, surveying, landscape design modifications, and environmental permitting for a new four building complex encompassing 300, … CONTINUE »