Archives: Projects

Link: Ellsworth Center Redevelopment Ellsworth Center Redevelopment

Ellsworth Center Redevelopment CONTINUE »

Link: Princeton Theological Seminary Princeton Theological Seminary

Princeton Theological Seminary ACT prepared a Stormwater Management Master Plan for the residential campus of the Princeton Theological Seminary in preparation for redevelopment … CONTINUE »

Link: PSE&G Utility Transmission Upgrade PSE&G Utility Transmission Upgrade

PSE&G Utility Transmission Upgrade This electrical transmission upgrade project included the program management associated with permit procurement and construction readiness for along a 7.5 mile transmission line in Burlington and Camd … CONTINUE »

Link: Ocean City Dredging Program Ocean City Dredging Program

Ocean City Dredging Program ACT Engineers has partnered with Anchor QEA to develop a dredging plan to maintain the waterway, lagoons and harbors in the bay area of Ocean City. … CONTINUE »

Link: Trenton Waterfront Park Trenton Waterfront Park

Trenton Waterfront Park As part of Trenton’s waterfront redevelopment program along the Delaware River, ACT Engineers designed the Waterfront Plaza and Riverwalk.  This waterfront development project is an 8 acre linear park … CONTINUE »

Link: Washington Boulevard Pocket Park Washington Boulevard Pocket Park

Washington Boulevard Pocket Park Washington Boulevard Pocket Park was designed to meet the needs of the neighboring residents. The project concept design was a collaborative effort between the residents of the adjacent townhouse … CONTINUE »

Link: Washington Crossing Bridge Washington Crossing Bridge

Washington Crossing Bridge As part of the Rehabilitation team, ACT Engineers was responsible for topographic survey, base mapping, wetland delineation, stake-out, permitting and coordination with multiple stakeholders … CONTINUE »

Link: Route 52 Causeway Replacement Route 52 Causeway Replacement

Route 52 Causeway Replacement Public Involvement began in 2002 with the two communities connected by a deteriorating causeway critical to both shore communities that depend on tourism and the ability to move large numbers of peopl … CONTINUE »