Projects

Waterview Office Park

Project Description

ACT Engineers work included site planning, cost estimating, Civil engineering, surveying, landscape design modifications, and environmental permitting for a new four building complex encompassing 300,000 sf of Class A office space including parking lots, “banked” parking, site lighting, highway access, water features, stormwater basins. Project constraints include extensive wetlands and soil permeability issues. This site encompasses 50 acres bisected by a natural drainage feature and is bordered by an active railroad.

Project Features

  • Pedestrian Bridge
  • Culvert Crossing
  • Phased Development
  • Subsurface Stormwater Management
  • Wet Pond Design
  • Low Environmental Impact Design Components

ACT's Role

Environmental Due Diligence • Topographic Survey • Boundary Survey • Wetland Survey • As-Built Survey • Conceptual Design • Site Planning • Soil Remediation • Roadway Design • Storm Drainage Design • Hydrology-Hydraulics Analysis • Municipal-County Approval • Permitting • Sanitary Pump Station

LOCATION

Hamilton Township, New Jersey

Categories

Project Photos

(Click/Touch Images to View Enlargements)